Get to know

our power plants

 

Located on the river Cambás, in the municipality of Aranga, A Coruña, Spain. It has an installed power output of 2 MVA. This is a fully automated semi-run-of-river installation. The power station building was constructed using locally-sourced materials and is fully integrated into the surrounding environment.

Located on the river Verdugo, in the municipality of A Lama in Pontevedra, Spain. It has an installed power output of 4.6 MVA. This is a fully automated run-of-river installation. The project was carried out with underground pipes along most of its length, without a loading chamber, in order to minimise the environmental impact.

Located on the river Oitavén, in the municipality of A Lama in Pontevedra, Spain. It has an installed power output of 4.2 MVA. This is a fully automated run-of-river installation. The design of the installation was aimed at its perfect integration, minimising its impact on the surrounding environment.

Located on the river Duero, in the municipality of Sardón de Duero in Valladolid, Spain. It has an installed power output of 1.5 MVA. This is a fully automated run-of-river installation. It is a hydroelectric plant at the foot of the weir that incorporates a fish ladder on the side opposite the intake, and during its construction, compensatory measures were implemented, such as the planting of 1.5 ha of vegetation on the river bank.