Norvento has over 30-year experience in promotion, development and operation of renewable energy installations.

We own a large portfolio of projects in different levels of development. We select our projects taking into account its quality, the environment and the available renewable resource to mitigate the risk of developers and investors. We have developed all the stages of projects in Spain and abroad, from resource assessment to construction. Our know-how involves wind, hydro, PV solar and bioenergies. We have developed projects ranging from one to hundreds of MW.

Our team has acquired a deep knowledge of the different technologies, so we are the ideal partner to develop big renewable energy projects satisfactorily.

Spain

Norvento’s installations reach 480MW in different levels of development. They cover the four types of renewable energy: hydro, wind, bioenergy and solar. Our team design the installations always taking into account the highest technical and environmental standards, turning them into sustainability models.

wind-farm

Installations in operation

Norvento’s installations already in operation reach over 110MW, of which 94MW correspond to three large wind farms located in Galicia, Spain. The rest of the MW amount to hydro and solar plants and bioenergy installations, both biomass and biogas. Use the link to Our Power Plants to get to know in detail our developments in operation.

wind-farm

Installations in development

Norvento has over 369MW of different renewable energy installations in development, of which 330MW correspond to 21 wind farms being developed in Spain. Moreover, seven hydro plants totalizing 28MW and 11MW of bioenergy installations, corresponding to two biomass plants and one biogas installation are being developed in the region of Galicia, Spain.

Brazil

Norvento has been present in Brazil since 2009 with our subsidiary Norvento Brasil Energias Renováveis Ltda. It has successfully developed projects totalizing 244MW in the Northeast of the country. Among the wind farms being developed the 150MW Papacaça project, located in the state of Pernambuco, can be highlighted.

brazil

Baixa de Feijão
Rio Grande do Norte

Wind farm located in Parazinho (Rio Grande do Norte). It has 120MW of installed capacity. Norvento led the development of the project from 2008 to 2011. Now it is in operation.

brazil

Aventura I
Rio Grande do Norte

Wind farm located in the municipality of João de Câmara (Rio Grande do Norte). It has 26MW of installed capacity. Norvento led the development of the project from 2008 to 2011. Now it is in construction.

brazil

Macambira
Rio Grande do Norte

Wind farm located in Lagoa Nova (Rio Grande do Norte). It has 38MW of installed capacity. Norvento led the development of the project from 2008 to 2011. Now it is in operation.

brazil

Tourinho
Rio Grande do Norte

Wind farm located in São Miguel de Gostoso (Rio Grande do Norte). It has 60MW of installed capacity. Norvento led the development of the project from 2008 to 2013.

USA
usa

Bloom
Ford & Clark Counties, Kansas

Norvento has been present in the USA since 2009 with our subsidiary Norvento USA LLC. From 2010 to 2014, Norvento led the development of the Bloom project in the counties of Ford and Clark (Kansas). The wind farm totalizes 178MW of installed capacity. It is expected to come into operation in 2017.

Poland
poland

Krasin & Piątkowo
Varmia & Masuria – Cuyavia & Pomerania

Norvento has been present in Poland since 2009 with our subsidiary Norvento Polska. Now we are developing two wind projects: Krasin located in the region of Varmia & Masuria and Piątkowo in Cuyavia & Pomerania with 30 and 48MW of installed capacity, respectively.

Chile
chile

San Juan de Chañaral de Aceituno
Antofagasta

Norvento has been present in Chile since 2008 with our subsidiary Norvento Chile, Ltda. From 2008 to 2013 Norvento led the development of a wind farm in San Juan de Chañaral de Aceituno (Antofagasta). The wind farm has 180MW of installed capacity and is in operation.

Italy
italy

Fosso dell’Oro
Macerata

Norvento has been present in Italy since 2010 with our subsidiary Fosso dell’Oro SRL. In December 2010, we completed the construction of 1MW Fosso dell’Oro photovoltaic plant located in Macerata (Marcas). The plant is now in operation.

Work with Norvento’s team and get rid of uncertainties in the promotion of your renewable energy projects

CONTACT OUR EXPERTS