According to Electra, Register of Electric Energy Producers of the Ministry for Ecological Transition, just 1,633.34MW out of the 2,979.65MW of wind power awarded in the 2017 tender were connected before the deadline —31st December 2019—.
In the 2017 tender, Norvento was awarded 128.60MW that were connected before the deadline. As a result, Norvento has commissioned six wind farms located in the province of Lugo, Spain. The wind farms are made up of 37 wind turbines and their power is equivalent to the total MW awarded. Read news