Norvento begins construction on pioneering 200 kW twin turbine site at Shoreham Port on the UK’s South Coast, creating a model for on-site wind energy consumption. Once installed, two nED100 100 kW turbines will feed electricity into the on-site Pump House, directly supporting the energy-intense process of maintaining water levels in the basins of the port, despite changes in the tide. The turbines will provide the environmentally conscious EcoPort with a means of further reducing its carbon footprint, alongside extensive financial savings and operational benefits. (Read More) (Acess Shoreham Port Website) (Read Press Release)
4 March 2016
Norvento starts Shoreham site construction
